Tuesday, January 7, 2014

The difference between poetry and rhetoric

I walked down the river Vuoksi at Imatra, and there were a lot of electric lines hanging above, coming from the power plant at the rapids. The total power is currently 178 MW, but there are renovations going on, to replace oldest turbines with newer ones, raising the power to 192 MW in 2013-2015. The engineer inside me approves.

(Posting title is from the poem Power by Audre Lorde.)

No comments: